- Posts: 1235
- Joined: Wed Jun 06, 2018 1:39 am
- Real Name: Bruce Simpson
best is to restored the backup, disconnect the orignal then run the upgrade with the the backup active leaving your original database intact
also smart to make DRP's of all active projects
and then install the new version over top of the existing
this should be covered in the manual, took a quick look and didn't locate it tho.... maybe look with a bit more care would turn up a resualt