Length of timeline in Fusion project

Hi. I have 2 video files thats approx a 100m long in my fusion project. However, my timeline is at 1000 secs.
How do I adjust my timeline to the time length of the longest asset in the project ?
EDIT:- Its only 2 tools that are the incorrect length. Not sure how to change them in the timeline.
How do I adjust my timeline to the time length of the longest asset in the project ?
EDIT:- Its only 2 tools that are the incorrect length. Not sure how to change them in the timeline.