Wed Dec 12, 2012 2:32 am
Hey all. I am relatively new to this software, and foolishly set my master timeline to 24p, while the footage was in 59.94. In addition, i am working with a baked product, so i had to use the scene detection to cut the whole thing up for coloring.
unfortunately, The problem is that I graded the whole 90 minute program, and didn't notice the frame rate issue until I began exporting. So right now, the whole thing is graded, a couple days work. But in the wrong frame rate. I am afraid that even exporting an EDL will give me issues with the source.
Ideally, I would figure out a way to change the frame rate of the master timeline. I am assuming that is impossible, but I remain hopeful. My backup plan is to create a new timeline in the same project, and use the grade I have already done. But I don't know if I can save this project. Does anyone know what my next steps should be?