Rui Branquinho wrote:Or, you can change the start time of the sequence to align with the ref clip timecode.
Yeah but that’s the opposite of what I need jjj
Sometimes you need to add some clips at the beginning of the timeline like logos and such and then the point is to adjust the ref to the timeline.
The starting TC of the timeline needs to be the same for delivery.
I do remember a time when it was possible to just type in the value but I guess for now changing the start TC of the ref will do.
Sent from my iPhone using Tapatalk