Relink clips - comprehensive search slow

Get answers to your questions about color grading, editing and finishing with DaVinci Resolve.
  • Author
  • Message
Offline
User avatar

dotkomrade

  • Posts: 63
  • Joined: Tue Sep 18, 2018 6:29 am
  • Real Name: Matthew Tapson

Relink clips - comprehensive search slow

PostMon Jan 11, 2021 8:45 am

Hi all. I'm busy working on a project that recently wrapped shooting. I have now been given a NAS with the entire month's footage, replacing the USB drive I've been grading Ep 01 from.

Everything is very well organised on the NAS, but I can't easily relink as Davinci doesn't seem to search subfolders. The comprehensive search works fine to replace the clips but it takes so long that it is faster to relink small batches of clips at a time. And there are several hundred.

Is there a way to get Davinci to search subfolders while relinking? If not, is there a way to speed up comprehensive search? Thanks in advance.

Info on project: Arri Mini shooting to 2k ProRes 4444. Ably managed by the DIT.
Windows 11 Pro, AMD 7950X, Radeon VII, 64Gb Ram, Decklink Mini 4K, Eizo CG247X
Resolve Studio 18.6.3 Build 19
Offline

Jim Simon

  • Posts: 34455
  • Joined: Fri Dec 23, 2016 1:47 am

Re: Relink clips - comprehensive search slow

PostMon Jan 11, 2021 3:39 pm

The speed of the hardware will be the limit here, I think.
My Biases:

You NEED training.
You NEED a desktop.
You NEED a calibrated (non-computer) display.
Offline
User avatar

Mel Matsuoka

  • Posts: 1366
  • Joined: Wed Aug 22, 2012 9:54 am
  • Location: Buffalo, NY

Re: Relink clips - comprehensive search slow

PostMon Jan 11, 2021 5:43 pm

If the only difference between the the two folders is the location of the top-most folder, then it’s faster to use the “Change Source Folder” option instead. As long as all the sub folder structures are the same, everything will relink instantly, using this method.
Blog: https://PostProductive.tv
YouTube: https://www.youtube.com/@postproductive
Offline
User avatar

dotkomrade

  • Posts: 63
  • Joined: Tue Sep 18, 2018 6:29 am
  • Real Name: Matthew Tapson

Re: Relink clips - comprehensive search slow

PostWed Jan 13, 2021 3:09 pm

Thanks. Unfortunately, in this case the media was media managed into a single folder initially so that wasn't an option. It's just weird that it would take like 5 hours to comprehensively search a few terabytes of media.

I do find it odd that Resolve doesn't seem to search in subfolders. Unless, of course, I'm missing something here. The same behaviour is exhibited when searching for media in the the media pool - it won't find anything in a folder a level below the one you're searching from. Unless, curiously, you select the folder you want to search in plus one other folder in the media pool. Also weird.
Windows 11 Pro, AMD 7950X, Radeon VII, 64Gb Ram, Decklink Mini 4K, Eizo CG247X
Resolve Studio 18.6.3 Build 19
Offline

Jim Simon

  • Posts: 34455
  • Joined: Fri Dec 23, 2016 1:47 am

Re: Relink clips - comprehensive search slow

PostWed Jan 13, 2021 3:15 pm

The drop down arrow next to the Search icon...


Bin Search.png
Bin Search.png (22.56 KiB) Viewed 2612 times
My Biases:

You NEED training.
You NEED a desktop.
You NEED a calibrated (non-computer) display.
Offline
User avatar

Mel Matsuoka

  • Posts: 1366
  • Joined: Wed Aug 22, 2012 9:54 am
  • Location: Buffalo, NY

Re: Relink clips - comprehensive search slow

PostWed Jan 13, 2021 8:14 pm

dotkomrade wrote:Thanks. Unfortunately, in this case the media was media managed into a single folder initially so that wasn't an option.


That's a bummer. I know it's too late now, but for future reference, you'll want to make sure that when media managing a Resolve project/timeline that you always enable the "Preserve Folder Hierarchy" option, so as to avoid relinking slowdowns like the one you're experiencing. I personally think this option should be enabled by default, but it isn't.

Image
Blog: https://PostProductive.tv
YouTube: https://www.youtube.com/@postproductive
Offline
User avatar

dotkomrade

  • Posts: 63
  • Joined: Tue Sep 18, 2018 6:29 am
  • Real Name: Matthew Tapson

Re: Relink clips - comprehensive search slow

PostFri Jan 15, 2021 11:09 am

Jim Simon wrote:The drop down arrow next to the Search icon...

Bin Search.png


Oh my word. Another little feature I've never noticed! Thank you for this.

Mel Matsuoka wrote:
That's a bummer. I know it's too late now, but for future reference, you'll want to make sure that when media managing a Resolve project/timeline that you always enable the "Preserve Folder Hierarchy" option, so as to avoid relinking slowdowns like the one you're experiencing. I personally think this option should be enabled by default, but it isn't.



Thanks Mel, I'll remember this for next time.
Windows 11 Pro, AMD 7950X, Radeon VII, 64Gb Ram, Decklink Mini 4K, Eizo CG247X
Resolve Studio 18.6.3 Build 19

Return to DaVinci Resolve

Who is online

Users browsing this forum: dirk-pel, Fully_Loaded34, qsipher, Robert John and 270 guests