Page 1 of 1

V16.2.8: Change frame rate of a Project

PostPosted: Sat Jul 17, 2021 10:11 am
by SteveMullen
I have believed that if I initially set FR to 24, for example, I could create a new empty Project with the desired FR, say 29.97. I could then copy the Timeline clips from old Project to the new Project everything and all would be fine.

But I have found the Export FR still locked to 24. You do have the option to change the FR to 29.97, but a 3:2 pulldown is applied.

Any idea how to make the new Project's export FR match the Project's initial FR?