Dwaine Maggart wrote:The Deliver page frame rate is generally locked to the project frame rate. You can't change the project frame rate of an existing project, if there is a timeline or any clips in the Media Pool.
You would need to make a new project, and set the project frame rate to 23.976 if that's what you need to deliver. You can hopefully use ColorTrace to get the grades from the original project into the new project.
Thank you, Ill check out the ColorTrace to see what I can do with that. There are only 4 clips, so I could also save the grade for each shot and reapply.
Also, maybe the project settings should be modified to not let the user change the frame rate once youve started a project. Its misleading to be able to change the value and not have it take effect.