Tue Jul 16, 2019 9:46 pm
Hi,
I got a project set to 24fps, with different cameras frame rates from 240fps to 60fps.
I usually conform the footage interpreting all to the same frame rate as my project and timeline. In this case I forgot one bin with some footage. I didn't start the editing yet, so I went to that folder and switch the frame rate for those clips into 24fps, now when I want to use those clips on any timeline I can't see the full length of each clip. It looks like for example if the clip running at 60fps was 3 seconds now at 24fps I can only see only 3 seconds instead of the full length of the clip.
I guess this is a bug but any ideas how to fix it? i could reload all the clips but that would be a pain because this was preselected already.
Thanks