Thu Oct 11, 2018 5:59 pm
Hi. I have 2 video files thats approx a 100m long in my fusion project. However, my timeline is at 1000 secs.
How do I adjust my timeline to the time length of the longest asset in the project ?
EDIT:- Its only 2 tools that are the incorrect length. Not sure how to change them in the timeline.
- Attachments
-
- Timeline with short items
- Screen Shot 2018-10-12 at 12.21.34 am.png (33.63 KiB) Viewed 358 times
-
- Timeline
- Screen Shot 2018-10-11 at 11.28.36 pm.png (43.1 KiB) Viewed 406 times