Hi there,
I hope the title is not too confusing

I have a timeline that I want to export as individual clips. Now I have the same clip edited more than once, e.g. the beginning and the end of the same clip.
When I render, I want to have it as a single clip, not as two individual clips; I'm aware that the clip might be a lot longer than I actually need it, but still.
I can enable such an option when I consolidate and trim a project, but I have no idea how to set this for a render.
//edit
Further: how about multiple timelines. For example, I have a 60sec film and a 30s "cutdown". We all know that cutdowns are rarely cutdowns and even many handles can be insufficiant.
Is there a way to "join" two timelines to the max length of each clip used?
This was requested lots of times from Flame artists as this works better for them. It was claimed Baselight is able to do this.
Any intel on how this is done?
Best,
Lucas